E3.5 · Power Roof Plan Home2 Suites · Bradenton
TAKEOFF / ACTUAL PLAN COUNTS
Select a type to isolate its numbered source marks.
IMPORTANT HVAC / ELECTRICAL NOTES
QUANTITIES / DIMENSIONS
Select a row to show its exact source basis.
ASSEMBLIES / ACCESSORIES
Roof equipment
DOAS-1, DOAS-2 and EF-10 plus their plotted WP disconnect/GFI accessories are individually marked; ratings and unshown controls are not inferred.
Circuit callouts
Five home-run/circuit callouts contain nine printed circuit numbers. Callout arrows and slashes are not measurable route length.
Sign power
One WP sign safety switch and one WP sign J-box are retained; architectural sign location/detail reference remains broken.
NOTES / REFERENCES
1. DISCONNECT FOR SIGN.
2. LOCATION FOR SIGN CONNECTION. VERIFY LOCATION WITH ARCHITECTURAL PLAN PRIOR TO INSTALLATION.
2
0
0
0
0
The two-line KEY NOTE table is the only note block on E3.5. HVAC coordination is conveyed by the DOAS-1, DOAS-2 and EF-10 tags and circuit associations, not by a separate note. No plumbing load or plumbing coordination note is printed.
SOURCE
E3.5 · Engineering PDF page 47
Issued 11.22.2024 · 1/8" = 1'-0" · PRINTED SCALE ONLY

POWER ROOF PLAN
BROKEN CHAINS & PLAN ISSUES
I1 · Open Coordination Reference
Keyed Note 2 requires verification with the architectural plan but gives no architectural sheet or detail number.
I2 · Open Panel Reference
MDP, L5.A and L1.B circuits are identified, but E3.5 gives no panel-schedule sheet/detail references for breaker, load or conductor validation.
I3 · Rating Gap
DOAS-1, DOAS-2, EF-10 and sign disconnect ratings, poles, voltage, phase, MCA/MOCP and enclosure/NEMA ratings are not printed on E3.5; WP alone means weather proof per E1.1.
I4 · Mechanical Coordination Gap
Mechanical equipment tags are plotted without a mechanical plan/schedule cross-reference; electrical sizing cannot be closed from E3.5 alone.
I5 · Routing Limit
The two measured curves are drawing centerlines/diagrammatic connections. Installed route, conduit, conductor, verticals, concealed routing, slack and fittings are not derivable and remain null.
I6 · Reference Background
Light-gray roof outlines, grids, roof drains and other architectural/plumbing background graphics are reference context and were excluded from electrical quantities.
I7 · Schedule Absence
No electrical, equipment or roof-device schedule is printed on E3.5; no SCHED or ALT quantity can be certified from this sheet.
Add working issue