C-9 - Drainage and Grading Plan Civil PDF page 9; issued 02/23/2024; 1" = 20 FT ยท PRINTED SCALE Existing impervious: 3,132.13 SF (0.07 AC) Demolition walks/drives/pavers: 3,284.2 SF Demolition curb: 266.2 LF Proposed buildings: 14,482.71 SF Proposed walks: 4,474.80 SF Proposed parking and drives: 41,198.38 SF Proposed pool: 1,933.74 SF Total proposed impervious: 62,089.67 SF (1.43 AC) DRAINAGE: Storm network is traced structure-to-structure - The main and branch centerlines are saved at the printed scale. Pipe sizes and hidden chamber manifolds are not inferred where C-9 does not print them legibly. IMPERVIOUS: Use the exact printed area schedule - The proposed impervious summary totals 62,089.67 SF (1.43 AC), including buildings, walks, parking/drives and pool. STORAGE: Underground chamber design depends on later details - C-9 identifies one underground storage chamber system and refers to details without a sheet/detail number. GRADING: Every printed spot elevation remains visible - Spot elevations and contours are retained on the source. They define grading but are not added together as a quantity. CIV-ADDR: Project address requires reconciliation - The civil set identifies 308 8th Street West. The architectural/MEP takeoff set identifies 716 3rd Avenue Drive West. Confirm the governing parcel and address before bid documents and RFIs are issued. CIV-ROOMS: Civil hotel program conflicts with architectural takeoff - C-8 through C-10 label a 131-room hotel. The architectural takeoff verifies 85 guestrooms, while the mechanical schedules reference 107. Preserve all three values until the design team identifies the governing program. C9-03: Underground storage detail reference is broken - The chamber callout says SEE DETAILS but does not identify a sheet or detail number. C9-04: Pipe sizes are not certified from this sheet alone - Visible storm centerlines are measured, but run sizes, chamber manifold lengths and fittings must be reconciled to drainage details and profiles. C9-05: Title-block sequence is offset - C-9 prints 10 of 20 in its title block; C-10 prints 11 of 20. Confirm the issue-set sheet numbering.