C-6 - Erosion & Sediment Control Details 1 Civil PDF page 6; issued 02/23/2024; NTS Type III posts: 6 FT maximum spacing Type IV posts: 10 FT maximum spacing Tracking entrance: 50 FT standard length Tracking entrance: 15 FT minimum width Supported fence: 10 FT maximum post spacing Support-fence trench: 4 IN x 6 IN Wood post: 36 IN maximum height Inlet protection: 12 FT apron dimensions shown EROSION: Four complete erosion-control assemblies - Type III/IV silt fence, soil-tracking prevention, supported silt fence and inlet/curb-inlet protection are separate requirements. TRACKING PAD: Carry the printed entrance geometry - The tracking-prevention detail prints a 50-foot standard length, 15-foot minimum width, slopes to drain, filter fabric and stabilized aggregate. MAINTENANCE: Inspection and sediment removal are recurring scope - Silt fence must be inspected after storm events, repaired as needed and cleared of sediment that could compromise performance. INLET PROTECTION: Both grate and curb-inlet treatments are shown - Filter cloth/aggregate treatment and washed-shell burlap-bag protection must remain until paving is complete. CIV-ADDR: Project address requires reconciliation - The civil set identifies 308 8th Street West. The architectural/MEP takeoff set identifies 716 3rd Avenue Drive West. Confirm the governing parcel and address before bid documents and RFIs are issued. C6-02: Detail count is not installed quantity - C-6 is NTS. The four assemblies and subdetails define means and materials; their project LF/EA must come from the erosion-control plan or field sequencing. C6-03: Sheet-total conflict - The title block prints Sheet 6 of 21, while the cover index identifies a 20-sheet civil set. C6-04: Source standards require current-edition confirmation - Details cite FDOT indexes and City of Bradenton standards dated 2010, 2013 and 2016. Confirm the adopted editions. C6-05: Temporary-control duration is open - Maintenance duration, relocations and replacement cycles are not quantified on this detail sheet.